<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Archives des Wattsypedia - Wattsy</title>
	<atom:link href="https://wattsy.solutions/en/category/wattsypedia-en/feed/" rel="self" type="application/rss+xml" />
	<link>https://wattsy.solutions/en/category/wattsypedia-en/</link>
	<description>La recharge pour tous, partout, à moindre coût</description>
	<lastBuildDate>Thu, 03 Sep 2026 02:55:58 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://wattsy.solutions/wp-content/uploads/cropped-Logo_carre-png-32x32.webp</url>
	<title>Archives des Wattsypedia - Wattsy</title>
	<link>https://wattsy.solutions/en/category/wattsypedia-en/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Have you ever wondered how to test a charging point in a laboratory without putting a car inside it?🔬🚘</title>
		<link>https://wattsy.solutions/en/have-you-ever-wondered-how-to-test-a-charging-point-in-a-laboratory-without-putting-a-car-inside-it%f0%9f%94%ac%f0%9f%9a%98/</link>
		
		<dc:creator><![CDATA[Videlec]]></dc:creator>
		<pubDate>Wed, 29 Jan 2025 17:44:20 +0000</pubDate>
				<category><![CDATA[Wattsypedia]]></category>
		<guid isPermaLink="false">https://wattsy.solutions/have-you-ever-wondered-how-to-test-a-charging-point-in-a-laboratory-without-putting-a-car-inside-it%f0%9f%94%ac%f0%9f%9a%98/</guid>

					<description><![CDATA[<p>L’article <a href="https://wattsy.solutions/en/have-you-ever-wondered-how-to-test-a-charging-point-in-a-laboratory-without-putting-a-car-inside-it%f0%9f%94%ac%f0%9f%9a%98/">Have you ever wondered how to test a charging point in a laboratory without putting a car inside it?🔬🚘</a> est apparu en premier sur <a href="https://wattsy.solutions/en/">Wattsy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row has-bg need-focus style-accent-bg row-container onepage-section" data-label="residentiel" data-name="residentiel" id="row-unique-0"><div class="row-background background-element">
											<div class="background-wrapper">
												<div class="background-inner" style="background-image: url(https://wattsy.solutions/wp-content/uploads/Wattsy_Parking.webp);background-repeat: no-repeat;background-position: center top;background-attachment: scroll;background-size: cover;"></div>
												<div class="block-bg-overlay style-accent-bg" style="opacity: 0.8;"></div>
											</div>
										</div><div class="row quad-top-padding quad-bottom-padding single-h-padding limit-width row-parent" data-height-ratio="25"><div class="wpb_row row-inner"><div class="wpb_column pos-middle pos-center align_center column_parent col-lg-12 half-internal-gutter"><div class="uncol style-spec style-dark animate_when_almost_visible zoom-in"  data-speed="600"><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-half" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-0" data-row="script-row-unique-0" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-0"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-1"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-3 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="vc_custom_heading_wrap "><div class="heading-text el-text" ><h2 class="h2" ><span>Have you ever wondered how to test a charging point in a laboratory without putting a car inside it?</span></h2></div><div class="clear"></div></div><div class="uncode_text_column" ><p><span style="font-weight: 400">At Wattsy we design our own charging stations in France. <img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f1eb-1f1f7.png" alt="🇫🇷" class="wp-smiley" style="height: 1em; max-height: 1em;" /> </span></p>
<p><span style="font-weight: 400">To guarantee the safety of our customers, we ensure the reliability and conformity of our products. To do this, we carry out a series of rigorous tests on our products. Laboratories in France are also responsible for testing and qualifying them against all the applicable French and European technical standards. These tests are varied and cover aspects as diverse as temperature rise, wear and tear, connectivity and behaviour in the event of abnormal use.    </span></p>
<p><span style="font-weight: 400">However, for practical and safety reasons, it is not always possible or simple to have electric vehicles available to test our charging points in laboratories or on our premises. To carry out certain tests, we use specialised tools to simulate the behaviour of an electric vehicle.  </span></p>
<p><span style="font-weight: 400">So you might as well avoid having to run extension leads from the 4th floor to the car park! </span></p>
<p><b>Simulating an electric vehicle in the laboratory</b></p>
<p><span style="font-weight: 400">Some devices are designed to recreate all the conditions of a conventional recharging cycle and carry out our tests in complete safety. </span></p>
<p><span style="font-weight: 400">It simulates the connection of the vehicle to the charging point, the correct activation of the charging points (the actuator, in the jargon) and the correct triggering of the charge. You can modify the power parameters and measure the main charging parameters. It&#8217;s also a way of checking that all the communication protocols between the chargepoint and the car are working properly (because yes, you can&#8217;t hear it, but your charging point is talking to your car&#8230;).  </span></p>
<p><b>Last but not least, this method can be used to simulate a number of anomalies:</b><span style="font-weight: 400"> by creating fault scenarios (overload, short-circuit, insulation fault), you can ensure that the terminal&#8217;s various safety mechanisms work as expected (lucky you!).</span></p>
<p><span style="font-weight: 400">At Wattsy, we use the ‘EVSE PCE-EVSE 310’ model from </span><a href="https://www.pce-instruments.com/french/pce-instruments-france-anbieter_7.htm" target="_blank" rel="noopener"><b>PCE Instruments,</b></a> <span style="font-weight: 400">which gives full satisfaction and also allows regular checks to be carried out on charging points that have already been installed.</span></p>
</div><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><a class="single-media-link" href="https://www.pce-instruments.com/french/pce-instruments-france-anbieter_7.htm" target="_blank" title="Site de PCE Instruments"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img fetchpriority="high" decoding="async" class="wp-image-133501" src="https://wattsy.solutions/wp-content/uploads/Logo_PCE-Instruments-300dpi-scaled.webp" width="2560" height="758" alt="" srcset="https://wattsy.solutions/wp-content/uploads/Logo_PCE-Instruments-300dpi-scaled.webp 2560w, https://wattsy.solutions/wp-content/uploads/Logo_PCE-Instruments-300dpi-300x89.webp 300w, https://wattsy.solutions/wp-content/uploads/Logo_PCE-Instruments-300dpi-1024x303.webp 1024w, https://wattsy.solutions/wp-content/uploads/Logo_PCE-Instruments-300dpi-768x228.webp 768w, https://wattsy.solutions/wp-content/uploads/Logo_PCE-Instruments-300dpi-1536x455.webp 1536w, https://wattsy.solutions/wp-content/uploads/Logo_PCE-Instruments-300dpi-2048x607.webp 2048w, https://wattsy.solutions/wp-content/uploads/Logo_PCE-Instruments-300dpi-350x104.webp 350w, https://wattsy.solutions/wp-content/uploads/Logo_PCE-Instruments-300dpi-scaled-uai-720x213.webp 720w" sizes="(max-width: 2560px) 100vw, 2560px" /></div>
					</div>
				</div></div></div></a></div></div><span class="btn-container btn-block" ><a role="button"  href="https://wattsy.solutions/en/blog-news/" class="custom-link btn btn-lg border-width-0 btn-color-jevc btn-circle btn-block btn-icon-left btn-ripple-out btn-border-animated" title="Blog &amp; Actualités">Return to the blog</a></span></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-3 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ></div></div></div></div></div><script id="script-row-unique-1" data-row="script-row-unique-1" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-1"));</script></div></div></div>
</div><p>L’article <a href="https://wattsy.solutions/en/have-you-ever-wondered-how-to-test-a-charging-point-in-a-laboratory-without-putting-a-car-inside-it%f0%9f%94%ac%f0%9f%9a%98/">Have you ever wondered how to test a charging point in a laboratory without putting a car inside it?🔬🚘</a> est apparu en premier sur <a href="https://wattsy.solutions/en/">Wattsy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Equipment and installation requirements by building type 🏢📄</title>
		<link>https://wattsy.solutions/en/equipment-and-installation-requirements-by-building-type-%f0%9f%8f%a2%f0%9f%93%84/</link>
		
		<dc:creator><![CDATA[Videlec]]></dc:creator>
		<pubDate>Thu, 28 Nov 2024 13:29:32 +0000</pubDate>
				<category><![CDATA[Wattsypedia]]></category>
		<guid isPermaLink="false">https://wattsy.solutions/equipment-and-installation-requirements-by-building-type-%f0%9f%8f%a2%f0%9f%93%84/</guid>

					<description><![CDATA[<p>L’article <a href="https://wattsy.solutions/en/equipment-and-installation-requirements-by-building-type-%f0%9f%8f%a2%f0%9f%93%84/">Equipment and installation requirements by building type 🏢📄</a> est apparu en premier sur <a href="https://wattsy.solutions/en/">Wattsy</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row has-bg need-focus style-accent-bg row-container onepage-section" data-label="residentiel" data-name="residentiel" id="row-unique-2"><div class="row-background background-element">
											<div class="background-wrapper">
												<div class="background-inner" style="background-image: url(https://wattsy.solutions/wp-content/uploads/Wattsy_Parking.webp);background-repeat: no-repeat;background-position: center top;background-attachment: scroll;background-size: cover;"></div>
												<div class="block-bg-overlay style-accent-bg" style="opacity: 0.8;"></div>
											</div>
										</div><div class="row quad-top-padding quad-bottom-padding single-h-padding limit-width row-parent" data-height-ratio="60"><div class="wpb_row row-inner"><div class="wpb_column pos-middle pos-center align_center column_parent col-lg-12 half-internal-gutter"><div class="uncol style-spec style-dark animate_when_almost_visible zoom-in"  data-speed="600"><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="vc_custom_heading_wrap "><div class="heading-text el-text" ><h2 class="font-955596 fontsize-160000 fontheight-179065 fontspace-210350 text-color-jevc-color text-uppercase" ><span>Residential, corporate and public parking lots</span></h2></div><div class="clear"></div></div><div class="vc_custom_heading_wrap "><div class="heading-text el-text" ><h1 class="fontsize-338686 fontspace-781688 font-weight-400 text-color-xsdn-color text-uppercase" ><span>What equipment and installation requirements?</span></h1></div><div class="clear"></div></div><div class="empty-space empty-half" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-2" data-row="script-row-unique-2" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-2"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-3"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-3 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="vc_custom_heading_wrap "><div class="heading-text el-text" ><h2 class="h2" ><span>Differentiated obligations for all building categories</span></h2></div><div class="clear"></div></div><div class="uncode_text_column" ><p><span style="font-weight: 400">European and French regulations have steadily tightened the requirements for equipping buildings, whether residential or commercial, and company vehicle fleets, to support the transition to electric mobility.</span></p>
<p><span style="font-weight: 400">Here we take a closer look at these obligations, both current and future, and try to make them as clear as possible. </span></p>
<p><span style="font-weight: 400">It is important to keep in mind that there are two types of obligation: </span></p>
<ul>
<li style="font-weight: 400"><span style="font-weight: 400">-the obligation to pre-equip spaces with electrical infrastructure, which simplifies the subsequent installation of charging points ; </span></li>
<li style="font-weight: 400"><span style="font-weight: 400">-the obligation to equip parking spaces with charging points.
<p> </span></li>
</ul>
<p><span style="font-weight: 400">These obligations then vary depending on: </span></p>
<ul>
<li style="font-weight: 400"><span style="font-weight: 400">-whether the building is new or old ;</span></li>
<li style="font-weight: 400"><span style="font-weight: 400">-the main use of the building: offices, housing, mixed use, etc.</span></li>
</ul>
<p>&nbsp;</p>
<h4><b>Pre-equipment obligations </b></h4>
<p><span style="font-weight: 400">This obligation is intended to facilitate the subsequent installation of charging points. It primarily involves setting up conduits for electrical cables, along with power supply and safety devices.  </span></p>
<p><span style="font-weight: 400">To supply these charging stations, electricity must be supplied :</span></p>
<ul>
<li style="font-weight: 400"><span style="font-weight: 400">-either via </span><b>a low-voltage main switchboard</b> <span style="font-weight: 400">from the building&#8217;s internal electrical installation &#8211; this is what we prefer with Wattsy for an initial installation ;</span></li>
<li style="font-weight: 400">&#8211;<span style="font-weight: 400">or via </span><b>a public electricity network structure located </b><span style="font-weight: 400">on the building&#8217;s site.</span></li>
</ul>
<p><span style="font-weight: 400">For pre-equipment, the LOM requires the installation of conduits whose size allows a square passage of at least 100 mm on each side to carry the energy to the charging point.</span></p>
<p><span style="font-weight: 400">In each of these options, the size of the main LV board must enable at least 20% of the car park&#8217;s total capacity to be supplied, with a minimum of one space equipped with a charging point. The power required will vary according to the number of spaces available (see IV).  </span></p>
<p><span style="font-weight: 400">Another development has also been announced: from 2027, and after transposition into French law, the European Energy Performance of Buildings (EPBD) Directive 2024/1275 will raise the obligations for installing charging points in non-residential car parks. </span></p>
<table>
<tbody>
<tr>
<td rowspan="2"><span style="font-weight: 400"> </span></td>
<td colspan="2"><b>Spaces to be pre-equipped for parking lots with more than 10 spaces</b></td>
<td><b>Additional obligations PEB directive</b></td>
</tr>
<tr>
<td><b>Between11 and 20</b></td>
<td><b>&gt; 20</b></td>
<td></td>
</tr>
<tr>
<td><b>New or substantially renovated residential buildings</b></td>
<td colspan="2"><span style="font-weight: 400">100%.</span></td>
<td></td>
</tr>
<tr>
<td><b>New non-residential buildings or those undergoing major renovation (1/4 of the building&#8217;s value)</b></td>
<td colspan="2"><span style="font-weight: 400">20% of spaces including 2% accessible to PRM</span></td>
<td><span style="font-weight: 400">By January 1, 2027 &#8211; </span><b>Parkings &gt;20 spaces</b> <span style="font-weight: 400">: 10% of spaces equipped or 50% pre-connection</span></td>
</tr>
<tr>
<td><b>New or substantially renovated mixed-use buildings with predominantly residential use</b></td>
<td><span style="font-weight: 400">100%</span></td>
<td rowspan="2"><span style="font-weight: 400">In proportion to the use of spaces</span></td>
<td></td>
</tr>
<tr>
<td><b>New mixed-use buildings or those undergoing major renovation, with predominantly non-residential use</b></td>
<td><span style="font-weight: 400">20% of spaces</span><span style="font-weight: 400"> </span><br />
<span style="font-weight: 400">2% for PRMs</span></td>
<td></td>
</tr>
</tbody>
</table>
<p>&nbsp;</p>
<h5><b>The LOM also distinguishes obligations for existing buildings</b></h5>
<p><span style="font-weight: 400">The criterion here is the date on which the building permit was filed. The legislator&#8217;s logic was twofold: the newer the building and the larger the parking area, the more pre-equipped it should be.  </span></p>
<table>
<tbody>
<tr>
<td><b>Date of building permit</b></td>
<td><b>Car park capacity</b></td>
<td><b>Pre-equipment required</b></td>
<td><b>Capacity to be reserved at the main LV board</b></td>
<td><b>Charging stations to be installed from January 1, 2025</b></td>
</tr>
<tr>
<td><b>After March 11, 2021</b></td>
<td><span style="font-weight: 400">Parking &gt; 10 spots</span></td>
<td><span style="font-weight: 400">20%</span></td>
<td><span style="font-weight: 400">20%</span></td>
<td rowspan="6"><span style="font-weight: 400">1 charge point for every 20 parking spaces, including at least 1 point accessible to PRMs</span></td>
</tr>
<tr>
<td rowspan="2"><b>Between January 1, 2017 and March 11, 2021</b></td>
<td><span style="font-weight: 400">Parking &lt; 40 spots</span></td>
<td><span style="font-weight: 400">10%. </span></td>
<td><span style="font-weight: 400">10%</span></td>
</tr>
<tr>
<td><span style="font-weight: 400">parking &gt; 40 spots</span></td>
<td><span style="font-weight: 400">20%</span></td>
<td><span style="font-weight: 400">20%</span></td>
</tr>
<tr>
<td><b>Between 1 January 2012 and 1 January 2017</b></td>
<td><span style="font-weight: 400">All car parks</span></td>
<td><span style="font-weight: 400">10%</span></td>
<td></td>
</tr>
<tr>
<td rowspan="2"><b>Before January 1, 2012</b></td>
<td><span style="font-weight: 400">Parking 20 spots &amp; urban area &gt; 50 000 inhabitants</span></td>
<td><span style="font-weight: 400">10%</span></td>
<td></td>
</tr>
<tr>
<td><span style="font-weight: 400">parking 40 spots &amp; urban area&lt; 50 000 inhabitants</span></td>
<td><span style="font-weight: 400">5%</span></td>
<td></td>
</tr>
</tbody>
</table>
<p>
</div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-3 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ></div></div></div></div></div><script id="script-row-unique-3" data-row="script-row-unique-3" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-3"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-4"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-3 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column" ></p>
<h4><b>Obligations to install charging points </b></h4>
<p><span style="font-weight: 400">For buildings that are not for residential use, such as offices, shops or public services, the obligations set out in the LOM will change from</span><span style="font-weight: 400"> 1 </span><span style="font-weight: 400">January 2025.</span> </p>
<p><span style="font-weight: 400">For the implementation of this obligation in 2025, if the work required to adapt the electrical network is considered to be significant (i.e. the cost of resizing the building&#8217;s connection to the electrical network upstream of the main LV board exceeds the cost of work on the downstream part),</span> <span style="font-weight: 400">the number of charging points is limited so that the work upstream of the main LV board (including the main LV board) does not exceed the total cost of work downstream of the main LV board.</span></p>
<p><span style="font-weight: 400">The French “Climat et Résilience” law of August 22, 2021 also requires local authorities to provide similar facilities by January 1, 2025 (parking lots with more than 20 spaces managed by a public service delegation, a public authority, or via a public contract).</span></p>
<p><span style="font-weight: 400">In addition to the 2025 deadline, the implementation of the EPB directive is further away, with obligations starting at smaller parking lot sizes, from 5 spaces upwards. </span></p>
<table>
<tbody>
<tr>
<td></td>
<td><b>Until December 31, 2024</b></td>
<td><b>From January 1</b><b>, </b><b>2025</b></td>
<td><b>From 2026/2027 (PEB)</b></td>
</tr>
<tr>
<td><b>New parking lot or major renovation, up to 10 spots</b></td>
<td><span style="font-weight: 400">1 charging point (with access to PRMs), ie. 10%</span></td>
<td></td>
<td rowspan="2"><span style="font-weight: 400">New parkings &gt; 5 spots : </span></p>
<ul>
<li style="font-weight: 400"><span style="font-weight: 400">50% of spots equipped; only for office buildings</span></li>
<li style="font-weight: 400"><span style="font-weight: 400">20% of spots equipped for non-residential buildings</span></li>
<li style="font-weight: 400"><span style="font-weight: 400">1 charging point in residential buildings (if the parking &gt;&gt;3 spots)</span></li>
</ul>
</td>
</tr>
<tr>
<td><b>New parking lot or major renovation of more than 200 spaces</b></td>
<td><span style="font-weight: 400">2, including 1 with access to PRM; ie. 1%</span></td>
<td rowspan="2"><span style="font-weight: 400">1 charging point for every 20 spaces, i.e. 5%. At least 1 spot for PRM.  </span></p>
<p><span style="font-weight: 400">For parking lots with more than 200 spaces: at least 2 PRMs, including 1 for exclusive use. </span></td>
</tr>
<tr>
<td><b>Existing parking lots with more than 20 spaces</b></td>
<td></td>
<td><span style="font-weight: 400">On 01/27 &#8211; Car parks &gt;20 spaces: 10% of spaces equipped or 50% pre-connected</span></td>
</tr>
</tbody>
</table>
<p>&nbsp;</p>
<h4><b>Beyond infrastructure, obligations for greening the company fleet? </b></h4>
<p><span style="font-weight: 400">The LOM also imposes obligations on companies with fleets of more than 100 vehicles to reduce their environmental impact according to the <a href="https://www.ecologie.gouv.fr/politiques-publiques/verdissement-du-parc-automobile">following timetable</a>: </span></p>
<ol>
<li style="font-weight: 400"><b>From January 2022:</b> <span style="font-weight: 400">10% of new vehicles must be low-emission (electric, plug-in hybrid, CNG, hydrogen, etc.).</span></li>
<li style="font-weight: 400"><b>From 2024:</b><span style="font-weight: 400"> this threshold rises to</span><b> 20% </b><span style="font-weight: 400">for fleets of over 100 vehicles.</span></li>
<li style="font-weight: 400"><b>From 2027:</b><span style="font-weight: 400"> the obligation for low-emission vehicles rises to</span> <b>40% </b><span style="font-weight: 400">of new vehicles purchased.</span></li>
<li style="font-weight: 400"><b>By 2030:</b> <span style="font-weight: 400">companies must aim for</span><b> 70%</b><span style="font-weight: 400"> low-emission vehicles in their new vehicle purchases.</span></li>
</ol>
<p><span style="font-weight: 400">Companies must therefore incorporate this transition into their fleet renewal plans in order to comply with the legislation, which also makes the pre-equipment and equipment obligations in commercial buildings less theoretical. </span></p>
<p>&nbsp;</p>
<h4><b>Power requirements to meet equipment obligations</b></h4>
<p><span style="font-weight: 400">In addition to these general equipment obligations, under French law there is also an obligation to size electrical installations in order to avoid having to reinvest in the infrastructure several times over. This obligation is broken down as follows: </p>
<p>  </span></p>
<table>
<tbody>
<tr>
<td><b>Number of parking spaces</b></td>
<td><b>Charging points in parking lots (for commercial or public service vehicles)</b></td>
<td><b>Charging points in parking lots for other vehicles</b></td>
</tr>
<tr>
<td><b>10 ≤ N ≤ 20</b></td>
<td><span style="font-weight: 400">15 kVA</span></td>
<td><span style="font-weight: 400">22 kVA</span></td>
</tr>
<tr>
<td><b>21 ≤ N ≤ 40</b></td>
<td><span style="font-weight: 400">22 kVA</span></td>
<td><span style="font-weight: 400">33 kVA</span></td>
</tr>
<tr>
<td><b>41 ≤ N ≤ 100</b></td>
<td><span style="font-weight: 400">30 kVA + 6 kVA (for every 10 pitches over 50)</span></td>
<td><span style="font-weight: 400">44 kVA + 8 kVA (for every 10 pitches over 50)</span></td>
</tr>
<tr>
<td><b>101 ≤ N &lt; 200</b></td>
<td><span style="font-weight: 400">60 kVA + 3.6 kVA (for every 10 slots over 100)</span></td>
<td><span style="font-weight: 400">84 kVA + 5 kVA (for every 10 slots over 100)</span></td>
</tr>
<tr>
<td><b>N &gt; 200</b></td>
<td><span style="font-weight: 400">96 kVA + 0,2 kVA x (N-200)</span></td>
<td><span style="font-weight: 400">134 kVA + 0,28 kVA x (N-200)</span></td>
</tr>
</tbody>
</table>
<p><span style="font-weight: 400">(article R111-14-3 of the Code de la construction et de l’habitation).</span></p>
</div><div class="uncode_text_column" ></p>
<h4><b>What about 2-wheelers on the company premises? </b></h4>
<p><span style="font-weight: 400">The LOM extends the obligation to provide cycle parking facilities when work is carried out on car parking facilities. The resulting regulations specify the security features, standardize the application to different types of construction and set a minimum surface area per space and a minimum number of spaces for all cycle parking areas. </span></p>
<table>
<tbody>
<tr>
<td><b>% Places to be provided</b></td>
<td><b>Today with the LOM</b></td>
<td><b>From 2026/2027 (PEB)</b></td>
</tr>
<tr>
<td><b>New tertiary or industrial buildings</b></td>
<td><span style="font-weight: 400">15% of the total number of employees simultaneously accommodated in the building</span></td>
<td rowspan="3"><span style="font-weight: 400">The EPB Directive requires the presence of bicycle parking spaces of at least 15% of the average capacity or 10% of the total capacity of use of non-residential buildings, taking into account the space also required for bicycles larger than standard bicycles.</span></td>
</tr>
<tr>
<td><b>Tertiary or industrial buildings with parking &gt; 10 spaces under construction</b></td>
<td><span style="font-weight: 400">The space reserved for secure parking includes a minimum number of spaces for employees or agents set at 10% of the total number of people accommodated simultaneously in the buildings.</span></td>
</tr>
<tr>
<td><b>Existing tertiary buildings, mainly used as workplaces, parking &gt; 10 spaces</b></td>
<td><span style="font-weight: 400">The space reserved for secure bicycle parking must include a minimum number of spaces for employees or agents, set at 10% of the total number of people simultaneously accommodated in the buildings.</span></p>
<p><span style="font-weight: 400">The obligation also applies to any co-owner whose co-ownership lot or lots include at least 10 employee parking spaces. In this case, the co-owner&#8217;s lot(s) must include a minimum number of spaces for employees or agents, set at 10% of the total number of people accommodated simultaneously on these premises.  </span></td>
</tr>
</tbody>
</table>
<p><span style="font-weight: 400">(Source : </span><a href="https://eur-lex.europa.eu/legal-content/FR/TXT/PDF/?uri=OJ:L_202401275"><span style="font-weight: 400">see the full text of the EU directive here</span></a><span style="font-weight: 400">)</span></p>
<p>&nbsp;</p>
<h4><b>What are the key takeaways ? </b></h4>
<p><span style="font-weight: 400">Obligations linked to the energy transition in companies are becoming more stringent, particularly for</span><b> office car parks.</b><span style="font-weight: 400">. With the LOM already in place, and the forthcoming EPB 2024/1275 directive, companies will not only have to anticipate the need for charging stations for their employees&#8217; electric vehicles, but also provide additional infrastructure to enable these installations to be scaled up. </span></p>
<p><span style="font-weight: 400">These measures are designed to support the growth of the electric vehicle fleet and encourage more sustainable mobility in companies, if only because they are not accompanied by a clearly defined penalty system. </span></p>
<p><span style="font-weight: 400">However, this could soon change because, unlike the LOM, the EPB Directive requires States to introduce a</span> <b>system of effective and dissuasive</b><span style="font-weight: 400"> penalties for infringements of the national provisions deriving from the Directive:</span></p>
<p><i><span style="font-weight: 400">&#8220;Member States shall lay down the rules on penalties applicable to infringements of the national provisions adopted pursuant to this Directive and shall take all measures necessary to ensure that they are implemented. These penalties must be effective, proportionate and dissuasive.&#8221;</span></i> <span style="font-weight: 400">(Article 34).</span></p>
<p><span style="font-weight: 400">This means that States must not only transpose the directive, but also</span> <b>provide for penalties in the event of non-compliance.</b><span style="font-weight: 400">which was not an obligation in texts such as the LOM. It is therefore in your interest, as companies or property managers, to anticipate these deadlines by working now on the conditions for electrifying your fleets and car parks.  </span></p>
</div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-3 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ></div></div></div></div></div><script id="script-row-unique-4" data-row="script-row-unique-4" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-4"));</script></div></div></div>
</div><p>L’article <a href="https://wattsy.solutions/en/equipment-and-installation-requirements-by-building-type-%f0%9f%8f%a2%f0%9f%93%84/">Equipment and installation requirements by building type 🏢📄</a> est apparu en premier sur <a href="https://wattsy.solutions/en/">Wattsy</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
